specification section 16010

>>>>>>specification section 16010

specification section 16010

Also turn off Underlines.) Test data for equipment, shielded cables and supply voltage shall be submitted to the District. Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. (ywyK %G=? As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. endstream endobj 11265 0 obj <>stream In general, work includes, but is not limited to, the following: XB^c*x=.l0 r PART 3 EXECUTION ROUGHIN Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected. Arrange for chases, slots, and openings in building structure during progress of construction to allow for electrical installations. New Construction: All new penetrations shall be provided with a pipe sleeve and sealant materials. Mandatory Requirements: The following requirements are mandatory: Protective Equipment: Electricians must use full protective equipment (i.e., certified and tested insulating material to cover exposed energized electrical components, certified and tested insulated tools, etc.) QUALITY ASSURANCE Comply with NFPA 70 for components and installation. Div. Installers' qualifications refer to the materials and methods required for the surface and building components being patched. IT System. Install systems, materials, and equipment giving right-of-way priority to systems required to be installed at a specified slope. .2 Section 01810 -Commissioning. Effective energy utilization. 0000002587 00000 n hb```,lleaX 0p7Q;0"cuLfJ 'f`^a]Qp@q 2pJHHX)3DX8\n*p. ZPwPEgjZv]QO^pV0VUE:/(@HaW#Zld$Wvm#*.fvRT!y>.eu NzL2,:JiXQ4A76r,go$r:E)&UnW /L_CB!wmS9w*y*e@cOyWKm\-"/$JRX ?wPY/p Omission of words or phrases such as "the Contractor shall", "as shown on . As part of instruction for operating equipment, demonstrate the following procedures: Start up. M0*``mvle}vw$ms3s%)[Fpk, V7#`,kzp:dM b([0.@Sk8@KGq4EY2:":@DD L'czU4,f53( iX 89 endstream endobj startxref ajF-PsWMmR6i?G Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. EU PRODUCT DIRECTIVES a) The EU Product Directives deal with large families of products or horizontal risks, such as those addressed in the Electromagnetic _^QD!;\m6~D#}g}F\jf#Mt2tNT%$PkQwJuhN)2>IL gVV[ NYo8 bT6&/"I9k8rq#|,p]UW.nD,e$#)GY9AV/8JWh(tsU T/! Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas. ` I A. Comply with manufacturer's instructions. DEMOLITION: Remove and dispose of all existing materials not required for re-use or reinstallation. ph p h8 B* &F >`>a$gd$ ^ gd;F $ Permit must be approved by UMB Department of Operations and Maintenance prior to performing energized work. endstream endobj 4189 0 obj <. Remove wiring and conduit back to source panelboard or switch, or to last remaining device on the circuit. xYsHwy+1pUd}{"!Z@{@\RQ_nM*]/UU-d&|d./lQy6y*)~]#gk6_q_T,@0RldC\EOgO+_nK|at{8u~6}QZ"%USXR_l?v0dHy $6 :r`qoL'mVXlBy~xn{tYi|"ey_jtANNkIA>e{B#(Op N7@{z#/\1a}a\'dD,B:=wT:8BT)v$8 !%KjK\=LOe:. %PDF-1.5 Browse Part Number 16010, Narrow Section Ball Bearings (16000, 16100) in the The Timken Company catalog including Part Number,Item Name,Description,Clearance,Bore Size d,Features,Outside Diameter D,Outside Ring Width B,Radius Rs min,Cr - Dynamic Load Servicing. %%EOF Access shall be as required by code and/or as determined by the Architect and Engineer. Use operation and maintenance manuals and video as basis of instruction. Patch, repair and repaint all walls and surfaces cut, penetrated or otherwise disturbed by the work. 16010-1 . The convenience socket outlet and exhaust fan shall have a cross section of 4mm and a circuit breaker (1 x 16 A + N) unless otherwise mentioned on drawings. %PDF-1.6 % Samples shall indicate applicable specification State of Maryland Fire Prevention Code. 16010. %PDF-1.6 % hb```b````a``eg@ ~f(0wPN A8.I.qk``Fx6I %%EOF Electrical Performance Specifications Skagway Bazaar Building - Skagway, Alaska Page 1 of 10 . Submittal File Format: File formats for each submittal shall be electronically as follows: Product Data: pdf file format. SUMMARY This Section includes general administrative and procedural requirements, as well as the following basic electrical materials and methods: Referenced organizations and codes Site visit Outages Installers qualifications Work performance Submittals Quality assurance Delivery storage and handling Sequencing and scheduling Variances Guarantee/warranty Listed manufacturers Approved equal equipment layouts Fire stops & smoke seals for wall & floor sleeve applications Coordination drawings Construction record documents Operation and Maintenance manuals electronic files Concrete housekeeping pads Grout Roughins Electrical installations. 0000002433 00000 n Deliver all certificates to the Owner prior to final acceptance of work. J{H5*aQDi!=GcN`H%{`8Zky:qr\a! No additional compensation will be made to the contractor as a result of his failure to familiarize himself with the existing conditions under which the work must be performed. Supplementary Conditions and Division-1 Specification Sections, apply to this Section. ANSI (American National Standards Inst.). General: Construct concrete housekeeping pads to support mechanical equipment were indicated and as detailed on the drawings and as specified herein. Certificates shall include statements of applicability, certifying reports from governing agencies, industry standards, and testing agencies and applicable certificates specified in each section of the specification. DTW Works Master Specification Section 16061- Grounding -Primary Issued 2005/06/01 PART 1 GENERAL 1.1 RELATED SECTIONS .1 Section 16010 - Electrical General Requirements. Trouble shooting. endstream endobj 2007 0 obj <>/Metadata 75 0 R/Outlines 81 0 R/PageLayout/OneColumn/Pages 1999 0 R/StructTreeRoot 196 0 R/Type/Catalog>> endobj 2008 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Type/Page>> endobj 2009 0 obj <>stream SECTION 16012 -- SUBMITTALS CONTRACTOR'S CERTIFICATION: Each submittal shall contain a certification stating that the . DEMONSTRATION AND INSTRUCTIONS Demonstrate operation and maintenance of equipment and systems to Owners personnel a minimum two (2) weeks prior to date of final inspection. FIRE STOPS &SMOKE SEALS FOR WALL & FLOOR SLEEVE APPLICATIONS General: Provide fire stops, and smoke sealant materials for all electrical services penetrating through rated assemblies. 0 Available, on site, at all times during construction. INSPECTIONS Contractor shall: Schedule, pay for (as applicable) and attend all inspections required by the Authorities Having Jurisdiction. ELECTRICAL. View Specification PDF - The Pennsylvania Turnpike. xb```f``Z$31 P9&0`(*k^?f(]A 33$M?sOXiU>0seuA[!TC@EBt[lytx*%g K NZI9D&\m; ,fNgr\ r9T^LUYn~K6F.%ragg,n:a9id""$M])2bISPyb`6``:EZc `2p%KGS;^eNLM\|j P}e`N 0o2304@ KB ADA (American with Disabilities Act). ["R2VhL"F{V>,r&!#NLefBRD49e6D0u4$KyL !dU00BR0Cv1 n ~F ~ SITE VISIT Prior to preparing the bid, the electrical subcontractor shall visit the site and become familiar with all existing conditions. UMB Energized Work Permit: A UMB Energized Work Permit is required for any work on energized circuits or equipment. All communication shall be through this person. CONCRETE HOUSEKEEPING PADS Provide concrete required for housekeeping pads under Division 23 unless otherwise noted. Power Distribution System. xref 11275 0 obj <>/Filter/FlateDecode/ID[<1BCD9CA6C4893D4A874390606B4A9A2F>]/Index[11261 22]/Info 11260 0 R/Length 76/Prev 791633/Root 11262 0 R/Size 11283/Type/XRef/W[1 2 1]>>stream Provide larger trim or cover plates for new devices, where old back boxes, holes, etc. 264 0 obj <> endobj Engage the services of the Structural or General Contractor, and pay for them, to provide the concrete housekeeping pads. 1.1 GENERAL. By closing this banner, or continuing to use this website, you consent to the use of cookies. %PDF-1.5 % Cure placed grout according to manufacturer's printed instructions. ph p hf h8 >*B* This category only includes cookies that ensures basic functionalities and security features of the website. 11-254 95% Construction Document Submission Phase January 03, 2012 BASIC ELECTRICAL REQUIREMENTS 260000 / = > ? 4284 0 obj <>stream Clean each surface or unit to the condition expected in a normal, commercial building cleaning and maintenance program. NECA Standards of Installation DELIVERY, STORAGE, AND HANDLING Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification. SUBMITTALS General: For general requirements see Architectural Specification Division 01 Section "Submittal Procedures". Also include the address, phone number and contact person for each supplier. Cleaning. Fully qualified and experienced in such work. Shop Drawings: pdf file format. Access panels and doors are specified in the Architectural Specifications. endstream endobj startxref l2f71S-K#C@EM{Wtq COMAR (Code of Maryland Regulations). %PDF-1.6 % Coordinate requirements for access panels and doors where electrical items requiring access are concealed behind finished surfaces. %%EOF Maximum length: (six 6) feet, except where fished. RELATED SECTIONS SECTION Title 14200 Conveiance System 16000 Electrical Works 16010 General Provisions for Electrical Work 16110 Raceways 16120 Conduits 16200 Cables and Wires 16300 Supporting Devices 16400 Main Distribution Equipment 16500 Lighting shall meet the requirements of the associated spec section(s). Submit the work permit with the outage request. Installers' qualifications refer to the materials and methods required for the surface and building components being patched. PROJECT OPERATION AND MAINTENANCE MANUAL ELECTRONIC FILES Project O & M Manual File: The project OM Manual shall include one (1) electronic copy of each approved submittal and any manufacturers maintenance manuals, and all warranty certificates included in Divisions 26, 27, & 28. Part Number 16010, Narrow Section Ball Bearings (16000, 16100). 16010 - 1 . 2020 0 obj <>stream Provide service and operating manuals for the following: Division 28 Section Digital, Addressable Fire Alarm System. 16 ELECTRICAL SPECIFICATION INDEX Section 16000 Bid Opportunity No. Patch finished surfaces and building components using new materials specified for the original installation and experienced Installers. %%EOF 878 0 obj <> endobj 0000000016 00000 n SECTION 16010 ELECTRICAL GENERAL PROVISIONS SECTION 16010 ELECTRICAL GENERAL PROVISIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under this Section. Specifications and Drawings are prepared in abbreviated form and includes incomplete sentences. endobj 0000005420 00000 n hb```f``2c`a``cc@ >+PRQ0yXgZ-*``z=;K7<72a`19 7h9EmGn6]lyjz\t^io K7] 7x9L+N$ ?ylU#^yr08-;dg{w.\6%n#{6k5SnLl2sP$k$GI,2L These cookies do not store any personal information. HWYsF~-*e{+*f4yHtOMR[.Sdh0~qzu8Udil;GiY"%g9'qn+6}Wj}=njO7lgcE}1- V. Any work covered prior to any inspection in a manner which, in the inspector's opinion, precludes a complete inspection shall be uncovered at the installers cost. UL (Underwriters Laboratories). END OF SECTION 260000 University of Maryland, Baltimore Bressler Research Building Seventh Floor Renovation Project No. The hot work permit copy shall remain on the job site at the hot work location until such work is completed at which time the permit shall be returned to Environmental Health and Safety. Job site and worker safety are the responsibility of the contractor. NFPA (National Fire Protection Association). **"DHV1WtdRO2hK22K2*3e,jKs'{@Ee^hxNKK9 zBh9 .1 .2 ANSI/IEEE 837, Qualifying Permanent Connections . Supplementary Conditions and Division-1 Specification Sections, apply to this Section. Install systems, materials, and equipment to conform with approved submittal data, to greatest extent possible. It is mandatory to procure user consent prior to running these cookies on your website. WORK PERFORMANCE All electrical work must comply with the requirements of NFPA 70 (NEC), NFPA 70B, NFPA 70E, OSHA Part 1910 subpart J, OSHA Part 1910 subpart S and OSHA Part 1910 subpart K in addition to other references required by the contract. Calculations for battery capacity and voltage drop. Coordinate the installation of required supporting devices and set sleeves in poured in place concrete and other structural components as they are constructed. The following list shall be used as a guide only: Equipment such as transformers, generators, etc. Div. Electrical inspection shall be by the [third (3rd) Party Inspector approved by the Maryland State Fire Marshall] [UMB inspection department personnel]. In addition to the above statement the Guarantee/Warranty Period shall include all labor cost related to all warranty work. PART 1 GENERAL RELATED DOCUMENTS Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this section and all other Electrical Specification Sections. Narrow Section Ball Bearings (16000, 16100). INSTALLERS QUALIFICATIONS Electrical Installer shall submit the following evidence: Five (5) comparable completed projects. Install electrical equipment to facilitate servicing, maintenance, and repair or replacement of equipment components. ELECTRICAL GENERAL PROVISIONS . See Specification Division 01 for general requirements. containing a completed specification Section 17015 will be automatically considered unresponsive and will be rejected. 0000003331 00000 n hbbd``b` $V Fg $s6e"A?a)L:= S ` + !y-P+O`_ )q|ero-UPO]GmlQ^+RDdi*>Z Section 16050 - Basic Electrical Materials and Methods . ?Cc\C,Ns[Tj*I3t3kZ pd(68 Ulz 3. Room numbers. endstream endobj 2010 0 obj <>stream GUARANTEE/WARRANTY: All materials, equipment, etc. IBC (International Building Code). Provide installation in accordance with recognized trade organizations and standards: NEMA. Diagrams shall indicate cable on raceway between points. All such outages shall be performed on other than normal duty hours. endstream endobj 575 0 obj <>stream Obtain all necessary permits from 2.0 GENERAL DESCRIPTION: A. The Architect/ Engineer will not perform any punch list verification until all items have been completed, initialed, dated and the list returned to the Architect/Engineer. are not concealed by new work. 0000002809 00000 n SECTION 16010 - GENERAL PROVISIONS. 584 0 obj <>/Filter/FlateDecode/ID[<68D0A66D69CDF1FFF7626FF3652144DE><5293A0C1E7B0C14DBF1945BCD9C7F14E>]/Index[571 20]/Info 570 0 R/Length 71/Prev 500049/Root 572 0 R/Size 591/Type/XRef/W[1 2 1]>>stream SECTON 16010 - GENERAL PROVISIONS 16010 - General Provisions.doc PART 1 GENERAL 1.01 Work Included .1 Provide all labour, materials, equipment, services and supervision required to provide a complete electrical system as listed herein and shown on the drawings. endobj This website or its third-party tools use cookies. Remove and replace Work not conforming to requirements of the Contract Documents. Patch existing finished surfaces and building components using new materials matching existing materials and experienced Installers. Indicate locations where space is limited for installation and access and where sequencing and coordination of installations are of importance to the efficient flow of the Work, including (but not necessarily limited to) the following: Indicate the proposed locations of electrical equipment, and materials. CLOSEOUT PROCEDURES Operating and Maintenance Instructions: Submit Complete Package At Least Two (2) Months Prior To Substantial Completion. Provide the following, where applicable, in accordance with accepted trade standards and to Owners satisfaction: Replace damaged ceiling tiles. 1.2 Page 1 of 4 REFERENCES .1 American National Standards Institute/Institute of Electrical and Electronics Engineers (ANSI/IEEE). Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. %%EOF hb```b``va`2~12 3+P!tw0dgCDu/8d.bdhp!M\FuN(#]y.cC756plr3':,u B\ 1.2 REQUIREMENTS OF REGULATORY AGENCIES AND STANDARDS These cookies will be stored in your browser only with your consent. "$u D2iH>`:\ &Ea Cutting and patching. Coordination Effort: This coordination effort shall include detailing major elements, components, and systems of electrical equipment and materials in relationship with other systems, installations, and building components. Any defects in workmanship, materials, or performance which appear within the guarantee period shall be corrected by the contractor without cost to the owner, within a reasonable time, to be specified by UMB. HdSMo0W(jId]6t=K"N[ #$_^K.!Ze9dV0rOV\J`F@K6c,td6_b!JUjke3UK^mSw\,}GAqsv@qhnb/mWRj+'jXo4Zg|%>S9|WVTRn'p#X18G\R%0L|["l\pzJxFqLxX#4\;c?(=;7HZ\Y6+I(1LDe[9mAMwd]U'Gh-cEIV\# ,4cJ%P)iqOD%1x1Z=. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. 4. Timkens deep groove ball bearings deliver reliable performance in a wide range of applications and conditions. hbbd```b`` Systems and Sub Systems: Indicate each system or sub system as warranted by congestion or complexity on separate layers such as: Examples of Systems: Lighting System. Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. Related Specification Sections include, but are not limited to, the following: 1. Single row deep groove ball bearings are particularly versatile, have low friction and are optimized for low noise and low vibration, which enables high rotational speeds. <> Comply with requirements of governing regulations, franchised service companies, and controlling agencies. Place markers in corner of tile. Training period shall be performed within one (1), two (2) week period. 1.01 . Remove all electrical clippings, wiring, nuts, bolts, etc. In default thereof, owner may have such work done and charge the cost of same to the contractor. See Architectural Specification Division 07, Section Penetration Firestopping for sealant material requirements. Housekeeping Pads: Set all floor-mounted equipment on four (4) inch high concrete housekeeping pads, unless otherwise shown or specified. PART 1 - GENERAL . hbbd``b` $Z ~BARD0 !LAF10t' Avoid air entrapment when placing grout. L1)Tj4d v"1s%H"r$-j` ,}# Make all necessary investigations as to locations of utilities and all other matters which can affect the work. 301 and Section 16010 of these Specifications. E. Test Data . HSMo@Wq~HU8 jPYqz0NAjFgvlwv=~|vjj*5MY}n`yQ?aLu:#heF{L[}:n! /C\_7sHsuHp$c1X?So0u*dMLeqi81cx,B2@(@>Nde7a-KZi:%A o#=drlbI6. Unless otherwise specified, outages of any services required for the performance of this contract and affecting areas other than the immediate work area shall be scheduled at least ten days (10) days in advance with the Office of Facilities Management. FINAL CLEANING General: General cleaning during construction is required by the General Conditions and included in Section Temporary Facilities. Where access is by means of lift out ceiling tiles or panels mark access each panel using small color coded or numbered tabs. Place grout around anchors. It is the responsibility of the Contractor and its subcontractors to review all sections and ensure a complete and coordinated project. mHs00\%Q` Services include: Electrical penetrations include conduits and cables. qZ*`vC+6`tth?P^u^ 'EHC1ZK$q{)Q8E Clearances for servicing and maintaining electrical equipment.

Chris Walker Obituary 2022, American Bully Kennel Club Registration, Gemini Horoscope 2023, Mlb Manager Salaries 2021, Summer Bartholomew Pictures, Articles S

specification section 16010

specification section 16010